w w w . z e l u s . c a
     Home           News           About Us           Contact Us           Links     

730 South Service Rd
Stoney Creek, ON L8E 5S7

   Manufacturing
   Preventive Maintenance & Inspections
   Engineering
   Service & Repairs
   Refurbishment & Modernization
   Operator Training
   Parts Supply
   Siemens Slideshow  
   Varcon Slideshow  
     Grimsby Water Treatment Plant
   Harris ReBar Slideshow
   DOCKS/DOORS
 (reg. TM)CanStahl
 (reg. TM)DBI-Sala
  (reg. TM)ConteMetal
 


ARCHIVE

 December 2010 Zelus opens London BRANCH
  Zelus opens new service depot in London, Ontario: 645 Newbold St., London, ON L6E 2T8, tel. 519-649-4929; fax 519-649-0200

 October 2010 Varcon Install
 
Installation at Grimsby Water Treatment Plant for Varcon Construction.  Slideshow

 June 2010: Arcelor Mittal Dofasco

 Custom Class D 15 Ton Trolley for Blast Furnace, designed, manufactured and delivered in less than 12 weeks. Great performance, team!

  AUGUST 2010  Manitoba Hydro
  Zelus designed, built and installs a huge winch (click here to see this monster) for Manitoba Hydro to pull a load of 35,000lbs, using 650 ft. of galvanized cable inch and an eight thick designed to operate at temperatures as low as minus 40 centigrade.

 July 2010: OPG Sir Adam Beck
  Mechanical, structural and electrical upgrade of 175  Ton Gantry Crane nears completion including:
    - New 750 foot conductor system with galvanized stands and hoods
    - Pivoting stair access complete with exterior siding to match the original crane  
    - New galvanized walkways and handrails at the 70 foot maintenance elevation 
    - New main hoist drum gear, pinion, and sheaves 
    - New controllers, resistors, hoisting limits 

  July 2010: Grimsby Water Treatment Plant, Niagara Region
  Engineering & manufacturing is underway for explosion-proof cranes for Varcon Construction. The hoists, trolleys and bridge drive mechanicals are provided by Stahl, internationally recognized as a leader in explosion proof technology.
Zelus is designing and providing the crane control and conductor/wiring systems
to provide a complete turnkey package.

   February 2010
   ZELUS completes exclusive agency agreement for Canada with Conte   Metal Mec of Italy.

June 2009 SIEMENS
ZELUS installed and commissioned two custom designed 125 / 130 Ton trolley hoists for Siemens Power Generation in Hamilton. The Hoists were completely synchronized with incorporated load cells and displays to facilitate the lifting of 400 Ton engines.
At an earlier date we made modifications in the programming of two 100 Ton hoists in the same bay to allow Siemens to make each lift using all 4 hoists at matched speeds, and with read-outs to monitor the load carried on each hook.
The new trolleys were designed and built by Zelus in Stoney Creek, and met all technical requirements within a very tight production schedule.
Congratulations to all our staff, and to our suppliers whose cooperation made this possible.  Photos have been posted at: Siemens.

 February 2009
ZELUS announces its affiliation with DBI-SALA to provide you with the best Fall Arrest systems, together with technical and engineering support, installations and inspections.
 August 2008:
Zelus made and shipped its longest crane (130 ft) to Carp, Ontario for Harris ReBar. Before shipping, the plant in Carp was prepped.  Installation was perfect and the crane passed its test with flying colours.  Photos.
 2007:
We upgraded all the electrics on an outdoor 30T overhead scrap crane. This project included all-new wiring, Controllers, Resistors, Panels, etc.
(photos to come).

 June 2006:
Zelus more than doubles it's manufacturing facility to accommodate our astonishing growth
 May 2006:
Filled another order for two 30 Ton cranes for a Montreal based Company. A few firsts for Zelus, building our first semi-gantry crane and our first 10 Ton transfer car.
 April 2006:
Designed, manufactured and installed two 32Tonne coil handling cranes for a Montreal based Company.
 Dec 2005:
Completed a 2 x 10 Ton custom crane, Variable Frequency Drives on all motions, designed for 60 degree ambient environment, for a Toronto based aluminum casting plant.

We specialize in innovative solutions. Whether for new or retrofitted equipment, let us work with you to design the best system for your application that fits your budget.



Service areas: Stoney Creek, Grimsby, Niagara Falls, Hamilton, Dundas, Ancaster, Oakville, Burlington, Mississauga, Toronto, Brampton, surrounding areas.
Copyright © 2007 Zelus Material Handling Inc. All Rights Reserved. Re-
Design & editing by macrif